A business considering the sale of electrical gear identified as Westinghouse can begin with the markings and records it already has. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a project controller closing out a capital job, the useful starting point is surplus versus retained items, quantity and deal timing. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.

Identify the manufacturer and the actual item

For equipment identified as Westinghouse, use the name shown on an existing record or safely accessible exterior label. Write down the equipment type, model and ratings when available, and match the information to the correct assembly or loose component. If a label or document uses a historical-looking name, report the wording as shown instead of assuming a present-day product relationship or support status. A maker's name alone does not establish the item's complete identity or value.

If a Westinghouse label is missing or cannot be read safely, share any existing purchase record, asset register or previous photograph and state its limitations. Do not open covers or approach energized equipment to locate another label. This is an independent buying service, not a claim of manufacturer affiliation, current support, compatibility or acceptance of every item.

Connect the sale to the shutdown plan

A decommissioning inventory should say whether the equipment is still installed, released from service, or already in storage. If the project has several milestones, identify the expected availability of each group and mark tentative dates accordingly. Share only existing records; the buyer does not require the seller to open, test or disconnect the equipment.

The sale scope should distinguish the distribution gear from assets the owner plans to retain or that belong to another party. After an accepted deal, the buyer handles qualified disconnects, crane and rigging, loading, freight and hauling. Discuss site access and the agreed schedule as part of the deal rather than assuming a universal pickup date.

Close out a capital job

A project controller can separate retained spares, replacement equipment and actual surplus using existing purchase and asset records. A proposed list should identify quantities, locations, known ratings and the source of each uncertain detail. Being listed on a purchase order does not prove that a particular component remains available for sale.

Record the person authorized to approve the transaction and any pending release milestones. Compare the final proposed sale scope with the latest inventory revision before accepting an offer. For an accepted deal, discuss upfront payment and buyer-handled site logistics alongside the project closeout schedule.

If relevant: Label the gaps in the records

Incomplete documentation does not prevent an initial discussion. Start with the equipment type, quantity, location and any manufacturer or ratings available from existing records or safely accessible exterior labels. If a drawing lacks a revision date or covers only part of a lineup, say so and identify which items it appears to describe.

Separate facts you can verify from an estimate or a previous owner's statement. If records conflict, provide both versions with a note rather than choosing one without evidence. The buyer can identify important gaps during review; sellers are not expected to open, operate, test or disconnect equipment to complete a file.

If relevant: Use the diagram as a reference

An existing one-line diagram may help identify distribution equipment, relationships between sections and labels used by the site. Identify its date or revision if shown, and tie the equipment offered to tags on the drawing where possible. Redact information you are not authorized to share, or discuss a suitable description with the buyer instead.

A diagram is not a prerequisite for an offer and may not reflect later changes. Point out known differences between the drawing, existing asset list and what can be seen safely. Do not open equipment, operate devices or produce an electrical assessment; the buyer can review the information already available.

Make the inventory easy to review

Begin with one line for each assembly or clearly identifiable group. Record the equipment type, quantity, site, installed or stored status, and the manufacturer, model, voltage and amperage where known. For a lineup, say how many sections are included and distinguish loose components from installed ones. The buyer needs to know which facts describe which item.

Use existing nameplate photos, asset registers or drawings where available, and label the source of uncertain details. If a record is old or conflicts with a safely accessible exterior label, send both and explain the difference. Missing information can remain unknown; there is no reason to open equipment, approach energized gear or test it for a quote.

Keep the proposed lot current

A useful scope lists quantities and locations along with retained or missing sections, loose items and known ownership restrictions. Confirm that the person discussing the transaction has authority to sell the listed property. If equipment belongs to multiple parties, explain the separate approvals instead of treating all assets as automatically available.

Availability may change during a shutdown or facility upgrade. Record which groups are ready, which depend on a future release, and which have uncertain dates. Share revisions when the list changes, and review the final offer against the latest version so that both sides understand exactly what is covered.

From review to an agreed offer

This is a buying-only business; it does not sell electrical equipment. It considers used, surplus and decommissioned gear across all voltage classes, including switchgear from decommissioned data centers and shut-down power plants. A buyer reviews the actual equipment, condition, information and proposed scope before deciding whether to make an offer; no individual item is guaranteed acceptance.

If the parties agree on a deal, the buyer pays upfront before pickup. Confirm the agreed price, payment method, items included, any exclusions and timing with the authorized seller. A preliminary inquiry or estimate is not a completed transaction. Ask for clarification before accepting an offer if the proposed scope or payment terms are unclear.

Coordinate the physical handoff

For accepted deals, the buyer handles crane, rigging, qualified disconnects, loading, freight and hauling. The seller does not have to test, disconnect, lift or load the equipment. Explain whether the gear remains installed or is already stored and provide the site contact, actual access rules and known constraints so the buyer can plan the agreed work.

Existing dimensions, weights and photographs may help if they are available, but mark estimates and unknowns honestly. The buyer and site contact coordinate the details for the actual property and deal; a particular crane, route or pickup date is not assumed. Do not approach energized equipment or perform electrical work to prepare a quote.