If an existing label or record shows 100 amperes, identify which specific assembly or device carries that marking before submitting a switchboard for review. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a contractor reconciling equipment from a finished project, the useful starting point is ownership, line-item identification and practical site access. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.
What the 100 amperes marking describes
If 100 amperes appears in a nameplate or existing record, identify whether the marking describes the overall assembly, a main device or an individual breaker. For a switchboard, record the equipment type, manufacturer, model and quantity as well as the specific location of the rating. The rating of a lineup is not automatically the rating of every device within it.
A 100 amperes marking alone does not establish voltage, physical dimensions, condition or value. Send the full available label or an existing document when it can be shared safely, and distinguish known facts from estimates. If a label is inaccessible or unreadable, leave it unknown; do not open equipment or conduct a test to obtain an offer.
Describe the switchboard
A switchboard distributes power and may consist of more than one section. Give the number of sections, the overall identity shown on accessible exterior labels, and whether the board is installed or in storage. If a main device or other components are included, identify them from existing records or visible markings rather than assuming their ratings match the board.
Tell the buyer about sections that are missing, retained, or proposed for sale separately. A photograph showing the overall arrangement can help connect a list of individual tags to the board. Note if the available drawings describe a previous configuration; records and current appearance may differ after an upgrade, and a discrepancy is worth disclosing.
Reconcile equipment from a finished job
A contractor closing a job may have stock at a jobsite and additional material in storage. Separate the items by actual owner and project allocation before proposing a sale. Existing purchase records or an asset list can help describe the equipment, but a job name alone does not prove the contractor owns every item.
Identify which assets are still installed and which are already stored, then share known pickup constraints at each property. Where a customer or another contractor must authorize release, note the dependency. The buyer can review the available information while the responsible parties clarify authority and timing.
If relevant: Show what remains in the lineup
An incomplete lineup is not necessarily a single, uniform item. List the sections that are present, any known missing section, and which breakers or other components are loose, installed, retained or unknown. Give each section an identifier from existing records or a safely accessible exterior label; do not try to open compartments to fill gaps.
Explain whether the missing pieces were removed before the current owner acquired the gear or whether the history is unknown. If the seller wants to retain any sections, mark them as excluded. A buyer can review an incomplete lineup, but completeness, condition and the actual sale scope influence whether an offer is possible.
If relevant: Present older equipment accurately
Older or discontinued gear may have incomplete records, changed ownership or components from different periods. Provide the identifiers you can verify, the equipment type and quantity, and any available history. Distinguish a date on a document from a verified manufacturing date, and avoid presenting an estimated age as a confirmed fact.
The fact that equipment is older or discontinued does not by itself establish value, compatibility or demand. Tell the buyer whether anything is missing and whether the asset is still installed or in storage. Review is case by case, and sellers do not need to test or dismantle equipment to request it.
Record facts and unknowns separately
A practical equipment list can be short: type, quantity, location, any known manufacturer and ratings, and whether the item is still installed or stored. Add section counts or related loose items where relevant. The same manufacturer may appear on several distinct assemblies, so match labels and records to the right line rather than combining unlike items.
Note visible exterior damage, missing components and the limits of the available history. Do not claim a device works simply because its exterior looks intact. Existing documentation and safely accessible photos help a buyer review the inventory, but a seller is never asked to open, operate or test equipment for this request.
Confirm who can release the assets
A clear proposal identifies the authorized seller, the specific items offered and any parts that are not included. Different owners, tenants, contractors or lenders may have an interest in different assets, so disclose known restrictions and approval requirements. Use a separate entry for each site or equipment group when authority or availability differs.
State whether items are still installed, already removed or stored, and provide your best known release window as an estimate. Other project work can affect the handoff. Both sides should agree on the actual scope and schedule rather than assuming that a preliminary inventory or a hoped-for date is final.
Understand the buying process
The business buys rather than sells equipment, and reviews used, surplus and decommissioned distribution gear of all voltage classes. It also considers switchgear from decommissioned data centers and shut-down power plants. A request starts a review, not a promise that every item or every proposed lot qualifies for an offer.
An agreed deal should identify the equipment and exclusions, the price and the payment and handoff arrangements. The buyer pays upfront for agreed deals before pickup. Review those terms with the person authorized to sell, and discuss open questions before accepting; changes in the actual scope may require a revised discussion.
Prepare the handoff, not the equipment
For an accepted deal, the buyer takes responsibility for qualified disconnects, crane, rigging, loading, freight and hauling. Sellers are not expected to test, disconnect or physically move equipment. Identify the site contact, the equipment's present location and any known access or other-work constraints that could affect coordination.
If site records include dimensions, weights or photographs, share the relevant information and explain its source. Unknowns are acceptable and can be discussed with the buyer. The actual plan and date depend on the accepted scope and site conditions; never approach energized equipment or open a cover to obtain missing details.