If an existing label or record shows 400 amperes, identify which specific assembly or device carries that marking before submitting a switchboard for review. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a facility supervisor with a single lineup and uncertain history, the useful starting point is visible condition, pictures, ratings and honest disclosure. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.

What the 400 amperes marking describes

If 400 amperes appears in a nameplate or existing record, identify whether the marking describes the overall assembly, a main device or an individual breaker. For a switchboard, record the equipment type, manufacturer, model and quantity as well as the specific location of the rating. The rating of a lineup is not automatically the rating of every device within it.

A 400 amperes marking alone does not establish voltage, physical dimensions, condition or value. Send the full available label or an existing document when it can be shared safely, and distinguish known facts from estimates. If a label is inaccessible or unreadable, leave it unknown; do not open equipment or conduct a test to obtain an offer.

Describe the switchboard

A switchboard distributes power and may consist of more than one section. Give the number of sections, the overall identity shown on accessible exterior labels, and whether the board is installed or in storage. If a main device or other components are included, identify them from existing records or visible markings rather than assuming their ratings match the board.

Tell the buyer about sections that are missing, retained, or proposed for sale separately. A photograph showing the overall arrangement can help connect a list of individual tags to the board. Note if the available drawings describe a previous configuration; records and current appearance may differ after an upgrade, and a discrepancy is worth disclosing.

Describe one lineup with an uncertain past

A facility supervisor may have one lineup and little information about its earlier use. Start with its location, number of visible sections and manufacturer or ratings already recorded or safely accessible. Describe known exterior condition and mark the rest as unknown; do not infer a full history from a single label or an asset name.

Existing photos or a one-line drawing may give the buyer a starting point, even if the document is incomplete. Tell the buyer whether the lineup is installed and what is known about access or release. Sellers do not need to open compartments, test the gear or arrange a disconnect to request an offer.

If relevant: Describe exposure and visible condition

Outdoor storage is a useful fact to disclose, not a diagnosis of electrical condition. Give the approximate storage period if known, whether the item was covered, and any visible exterior damage, corrosion or missing panels that can be observed safely. If the storage history before your ownership is unknown, distinguish that uncertainty from the period you can describe.

If several assemblies have different histories, make separate inventory lines instead of describing the whole lot as identically stored. Existing photographs may help show condition and packaging. Do not test, open, clean or move equipment to make it look better; offer the buyer an accurate description and let the review determine interest.

If relevant: Map the decision and release sequence

A decommissioning timeline should distinguish the proposed inventory, owner approval, equipment release and pickup coordination. For each group, state whether it is available now or expected later, and identify dependencies on other work. A projected date is not an appointment; update the buyer when milestones change or an item is retained.

Before accepting, agree on the equipment and price, upfront payment and site coordination. For accepted deals the buyer handles qualified disconnects, crane, rigging, loading, freight and hauling. The seller need not perform physical or electrical work to obtain a quote, and separate stages may require separate arrangements.

Link records to the actual equipment

An asset tag or existing inventory number can connect a description, photograph and location without turning every item into a separate narrative. Give quantities and identify what is included, excluded or missing. Manufacturer and model are helpful when known, while voltage and amperage should be associated with the particular label or device they describe.

Safe exterior photos and existing documents may provide a useful starting point. A drawing can be out of date and one breaker label does not necessarily describe a whole lineup, so identify the source of each claim. If the label cannot be reached safely or the history is uncertain, tell the buyer rather than guessing.

Confirm who can release the assets

A clear proposal identifies the authorized seller, the specific items offered and any parts that are not included. Different owners, tenants, contractors or lenders may have an interest in different assets, so disclose known restrictions and approval requirements. Use a separate entry for each site or equipment group when authority or availability differs.

State whether items are still installed, already removed or stored, and provide your best known release window as an estimate. Other project work can affect the handoff. Both sides should agree on the actual scope and schedule rather than assuming that a preliminary inventory or a hoped-for date is final.

Understand the buying process

The business buys rather than sells equipment, and reviews used, surplus and decommissioned distribution gear of all voltage classes. It also considers switchgear from decommissioned data centers and shut-down power plants. A request starts a review, not a promise that every item or every proposed lot qualifies for an offer.

An agreed deal should identify the equipment and exclusions, the price and the payment and handoff arrangements. The buyer pays upfront for agreed deals before pickup. Review those terms with the person authorized to sell, and discuss open questions before accepting; changes in the actual scope may require a revised discussion.

Prepare the handoff, not the equipment

For an accepted deal, the buyer takes responsibility for qualified disconnects, crane, rigging, loading, freight and hauling. Sellers are not expected to test, disconnect or physically move equipment. Identify the site contact, the equipment's present location and any known access or other-work constraints that could affect coordination.

If site records include dimensions, weights or photographs, share the relevant information and explain its source. Unknowns are acceptable and can be discussed with the buyer. The actual plan and date depend on the accepted scope and site conditions; never approach energized equipment or open a cover to obtain missing details.