If an existing label or record shows 1,200 amperes, identify which specific assembly or device carries that marking before submitting a switchgear lineup for review. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a project controller closing out a capital job, the useful starting point is surplus versus retained items, quantity and deal timing. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.
What the 1,200 amperes marking describes
If 1,200 amperes appears in a nameplate or existing record, identify whether the marking describes the overall assembly, a main device or an individual breaker. For a switchgear lineup, record the equipment type, manufacturer, model and quantity as well as the specific location of the rating. The rating of a lineup is not automatically the rating of every device within it.
A 1,200 amperes marking alone does not establish voltage, physical dimensions, condition or value. Send the full available label or an existing document when it can be shared safely, and distinguish known facts from estimates. If a label is inaccessible or unreadable, leave it unknown; do not open equipment or conduct a test to obtain an offer.
Describe the switchgear lineup
Switchgear is generally identified as a group of protective and switching equipment, often arranged in sections. Describe the lineup as a whole, but list distinct sections and loose breakers separately when you can. Existing records or an exterior view may show the manufacturer, model, ratings and section count. A single photograph of a long lineup may not show everything included.
State whether the lineup is still installed or has already been removed, and identify any obviously absent sections or loose components. Use words such as unknown when you cannot verify a detail. A buyer needs to understand the actual scope, not assume that every compartment is complete or that a label on one breaker describes the entire lineup.
Close out a capital job
A project controller can separate retained spares, replacement equipment and actual surplus using existing purchase and asset records. A proposed list should identify quantities, locations, known ratings and the source of each uncertain detail. Being listed on a purchase order does not prove that a particular component remains available for sale.
Record the person authorized to approve the transaction and any pending release milestones. Compare the final proposed sale scope with the latest inventory revision before accepting an offer. For an accepted deal, discuss upfront payment and buyer-handled site logistics alongside the project closeout schedule.
If relevant: Plan for separate release dates
When equipment becomes available in stages, identify each group and its tentative release date rather than treating the whole inventory as ready now. Note dependencies such as owner approval, another contractor's schedule or equipment that must remain in service. If a date is uncertain, label it as an estimate and update the buyer when it changes.
Clarify whether the proposed transaction covers all stages or only a particular group. An accepted deal should establish the agreed scope, upfront payment and a coordination plan for the buyer-handled qualified disconnects and logistics. Do not assume that separate sites or later stages automatically share one pickup appointment.
If relevant: Use the diagram as a reference
An existing one-line diagram may help identify distribution equipment, relationships between sections and labels used by the site. Identify its date or revision if shown, and tie the equipment offered to tags on the drawing where possible. Redact information you are not authorized to share, or discuss a suitable description with the buyer instead.
A diagram is not a prerequisite for an offer and may not reflect later changes. Point out known differences between the drawing, existing asset list and what can be seen safely. Do not open equipment, operate devices or produce an electrical assessment; the buyer can review the information already available.
Make the inventory easy to review
Begin with one line for each assembly or clearly identifiable group. Record the equipment type, quantity, site, installed or stored status, and the manufacturer, model, voltage and amperage where known. For a lineup, say how many sections are included and distinguish loose components from installed ones. The buyer needs to know which facts describe which item.
Use existing nameplate photos, asset registers or drawings where available, and label the source of uncertain details. If a record is old or conflicts with a safely accessible exterior label, send both and explain the difference. Missing information can remain unknown; there is no reason to open equipment, approach energized gear or test it for a quote.
Confirm who can release the assets
A clear proposal identifies the authorized seller, the specific items offered and any parts that are not included. Different owners, tenants, contractors or lenders may have an interest in different assets, so disclose known restrictions and approval requirements. Use a separate entry for each site or equipment group when authority or availability differs.
State whether items are still installed, already removed or stored, and provide your best known release window as an estimate. Other project work can affect the handoff. Both sides should agree on the actual scope and schedule rather than assuming that a preliminary inventory or a hoped-for date is final.
Understand the buying process
The business buys rather than sells equipment, and reviews used, surplus and decommissioned distribution gear of all voltage classes. It also considers switchgear from decommissioned data centers and shut-down power plants. A request starts a review, not a promise that every item or every proposed lot qualifies for an offer.
An agreed deal should identify the equipment and exclusions, the price and the payment and handoff arrangements. The buyer pays upfront for agreed deals before pickup. Review those terms with the person authorized to sell, and discuss open questions before accepting; changes in the actual scope may require a revised discussion.
Coordinate the physical handoff
For accepted deals, the buyer handles crane, rigging, qualified disconnects, loading, freight and hauling. The seller does not have to test, disconnect, lift or load the equipment. Explain whether the gear remains installed or is already stored and provide the site contact, actual access rules and known constraints so the buyer can plan the agreed work.
Existing dimensions, weights and photographs may help if they are available, but mark estimates and unknowns honestly. The buyer and site contact coordinate the details for the actual property and deal; a particular crane, route or pickup date is not assumed. Do not approach energized equipment or perform electrical work to prepare a quote.
