If an existing label or record shows 1,200 amperes, identify which specific assembly or device carries that marking before submitting an individual breaker for review. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a site owner preparing several equipment groups for disposition, the useful starting point is inventory clarity, release dates and transaction authorization. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.
What the 1,200 amperes marking describes
If 1,200 amperes appears in a nameplate or existing record, identify whether the marking describes the overall assembly, a main device or an individual breaker. For an individual breaker, record the equipment type, manufacturer, model and quantity as well as the specific location of the rating. The rating of a lineup is not automatically the rating of every device within it.
A 1,200 amperes marking alone does not establish voltage, physical dimensions, condition or value. Send the full available label or an existing document when it can be shared safely, and distinguish known facts from estimates. If a label is inaccessible or unreadable, leave it unknown; do not open equipment or conduct a test to obtain an offer.
Describe individual circuit breakers
Circuit breakers may be part of a larger lineup or offered as loose units. List each distinct manufacturer, model or catalog number, rating and quantity when known, and say whether units are installed or stored separately. An overall lineup rating should not be treated as the rating of every individual breaker inside it.
If a breaker is described as drawout, report that only when known from an existing label or record, and say whether it is installed or loose. Record visible exterior condition and missing accessories without trying to remove or operate anything. A matching name or amperage by itself does not establish compatibility with another assembly.
Organize several equipment groups
A site owner can divide a proposed disposition into identifiable equipment groups with quantities, locations and release status. Note whether an item is installed or already removed and identify the person who can authorize the sale. Explicitly list retained components so that a discussion about one assembly does not inadvertently include another.
Different groups may have different dates or access constraints. A simple revision date on the inventory makes it easier to see which information is current. Share existing records and safe exterior photos where available, and tell the buyer when ownership, condition or availability is not yet confirmed.
If relevant: Plan for separate release dates
When equipment becomes available in stages, identify each group and its tentative release date rather than treating the whole inventory as ready now. Note dependencies such as owner approval, another contractor's schedule or equipment that must remain in service. If a date is uncertain, label it as an estimate and update the buyer when it changes.
Clarify whether the proposed transaction covers all stages or only a particular group. An accepted deal should establish the agreed scope, upfront payment and a coordination plan for the buyer-handled qualified disconnects and logistics. Do not assume that separate sites or later stages automatically share one pickup appointment.
If relevant: Keep each site’s list separate
For a multi-site sale, create a separate equipment list for each location, with a site contact, quantities, ownership status and available release date. A shared spreadsheet can work if every line clearly identifies the property. Similar equipment at two sites should not be assumed to have the same condition, availability or handling requirements.
Describe access restrictions and any approval dependencies separately for each site. The buyer can discuss a combined or staged proposal, but neither a single submission nor a shared owner guarantees that every location or item will be accepted. Confirm the final deal and payment terms against the actual sites and assets included.
Record facts and unknowns separately
A practical equipment list can be short: type, quantity, location, any known manufacturer and ratings, and whether the item is still installed or stored. Add section counts or related loose items where relevant. The same manufacturer may appear on several distinct assemblies, so match labels and records to the right line rather than combining unlike items.
Note visible exterior damage, missing components and the limits of the available history. Do not claim a device works simply because its exterior looks intact. Existing documentation and safely accessible photos help a buyer review the inventory, but a seller is never asked to open, operate or test equipment for this request.
Set the sale scope and release date
Identify who owns the equipment and who is authorized to agree to a sale. Note any known lease, lien, retained component or approval that could limit the proposed transaction. If the equipment is on more than one property, keep each site and contact separate. A property owner's name does not automatically establish ownership of every piece of gear.
Explain whether the equipment is available now or expected after a project milestone. A tentative release date is not a scheduled pickup, and a list submitted for review is not a completed deal. If a component is later retained or an approval remains outstanding, update the buyer before finalizing the included equipment and timing.
Review the offer against the list
Equipment of all voltage classes may be considered, whether used, surplus or decommissioned. The business buys equipment and does not sell it; examples of sources it considers include decommissioned data centers and shut-down power plants. Interest and pricing depend on the actual equipment, condition, proposed scope and review, not merely on a title or a single rating.
When an offer is made, compare its included items and exclusions with the current inventory. For an agreed deal, the buyer pays upfront before pickup. Confirm the agreed price, payment method and any dependencies with the authorized seller, and resolve discrepancies before treating the transaction or pickup schedule as final.
Coordinate the physical handoff
For accepted deals, the buyer handles crane, rigging, qualified disconnects, loading, freight and hauling. The seller does not have to test, disconnect, lift or load the equipment. Explain whether the gear remains installed or is already stored and provide the site contact, actual access rules and known constraints so the buyer can plan the agreed work.
Existing dimensions, weights and photographs may help if they are available, but mark estimates and unknowns honestly. The buyer and site contact coordinate the details for the actual property and deal; a particular crane, route or pickup date is not assumed. Do not approach energized equipment or perform electrical work to prepare a quote.
