An existing 13,800-volt marking can help describe the switchgear being offered, but it should be tied to the exact device or assembly on which it appears. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For an operations manager preparing for a facility transition, the useful starting point is inventory grouping and decision-ready records. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.
Document the 13,800 volts rating
If 13,800 volts is shown in an existing record or on a safely accessible exterior label, associate that number with the actual switchgear being offered. Record the equipment type, manufacturer, model and other ratings when available. Related assemblies and individual devices can have different markings, so a number copied from one component should not be assumed to describe the whole lot.
The buyer considers equipment across all voltage classes, but a 13,800 volts description alone does not establish condition, suitability or value. Share the complete available nameplate or existing documentation, note what is missing, and identify any conflict between records. Sellers do not have to test, operate, open or disconnect equipment to request a review.
Describe the switchgear lineup
Switchgear is generally identified as a group of protective and switching equipment, often arranged in sections. Describe the lineup as a whole, but list distinct sections and loose breakers separately when you can. Existing records or an exterior view may show the manufacturer, model, ratings and section count. A single photograph of a long lineup may not show everything included.
State whether the lineup is still installed or has already been removed, and identify any obviously absent sections or loose components. Use words such as unknown when you cannot verify a detail. A buyer needs to understand the actual scope, not assume that every compartment is complete or that a label on one breaker describes the entire lineup.
Create decision-ready groups
For a facility transition, a decision-ready list separates equipment offered for sale from equipment still needed for operations or another project. Use a distinct entry for each assembly or recognizable group, identify its location and quantity, and link it to the records you already have. That gives an authorized decision-maker something specific to review.
Where a detail is not yet confirmed, mark it as pending rather than allowing a draft list to look final. A later revision can identify what changed: an added breaker, a retained section or a new release date. This helps keep the proposed scope and the eventual agreement aligned.
If relevant: Identify the replaced equipment
An upgrade can leave the old and new equipment with similar descriptions. Identify the equipment being sold by its existing tag, manufacturer or location and clearly exclude the replacement and any retained spares. State whether the old equipment is still installed, already removed or expected to be released later.
An existing project schedule may help communicate availability, but dates can change as work proceeds. Mark tentative dates and identify the authorized site contact. The seller need not disconnect or test the equipment; after an accepted deal the buyer handles qualified disconnects and the agreed physical logistics.
If relevant: Separate leftover stock from installed work
At project closeout, construction surplus can include unused purchased items, returned stock, replaced equipment and items belonging to subcontractors. Separate those categories and establish the authority to sell each one. Identify quantities and existing manufacturer or rating information, and distinguish packaging from evidence that an item is complete or unused.
State where the material is stored and whether loose accessories are included. If a project record lists equipment that was actually installed or retained, correct the sale list rather than sending the entire purchase schedule as available inventory. The buyer can assess a partial, accurate list before discussing an offer.
Record facts and unknowns separately
A practical equipment list can be short: type, quantity, location, any known manufacturer and ratings, and whether the item is still installed or stored. Add section counts or related loose items where relevant. The same manufacturer may appear on several distinct assemblies, so match labels and records to the right line rather than combining unlike items.
Note visible exterior damage, missing components and the limits of the available history. Do not claim a device works simply because its exterior looks intact. Existing documentation and safely accessible photos help a buyer review the inventory, but a seller is never asked to open, operate or test equipment for this request.
Keep the proposed lot current
A useful scope lists quantities and locations along with retained or missing sections, loose items and known ownership restrictions. Confirm that the person discussing the transaction has authority to sell the listed property. If equipment belongs to multiple parties, explain the separate approvals instead of treating all assets as automatically available.
Availability may change during a shutdown or facility upgrade. Record which groups are ready, which depend on a future release, and which have uncertain dates. Share revisions when the list changes, and review the final offer against the latest version so that both sides understand exactly what is covered.
From review to an agreed offer
This is a buying-only business; it does not sell electrical equipment. It considers used, surplus and decommissioned gear across all voltage classes, including switchgear from decommissioned data centers and shut-down power plants. A buyer reviews the actual equipment, condition, information and proposed scope before deciding whether to make an offer; no individual item is guaranteed acceptance.
If the parties agree on a deal, the buyer pays upfront before pickup. Confirm the agreed price, payment method, items included, any exclusions and timing with the authorized seller. A preliminary inquiry or estimate is not a completed transaction. Ask for clarification before accepting an offer if the proposed scope or payment terms are unclear.
Prepare the handoff, not the equipment
For an accepted deal, the buyer takes responsibility for qualified disconnects, crane, rigging, loading, freight and hauling. Sellers are not expected to test, disconnect or physically move equipment. Identify the site contact, the equipment's present location and any known access or other-work constraints that could affect coordination.
If site records include dimensions, weights or photographs, share the relevant information and explain its source. Unknowns are acceptable and can be discussed with the buyer. The actual plan and date depend on the accepted scope and site conditions; never approach energized equipment or open a cover to obtain missing details.
