If an existing label or record shows 600 amperes, identify which specific assembly or device carries that marking before submitting a mixed equipment list for review. We buy used, surplus and decommissioned electrical equipment; we do not sell gear. We consider all voltage classes, subject to review. For a contractor reconciling equipment from a finished project, the useful starting point is ownership, line-item identification and practical site access. Identify what is actually offered, share what is known and leave uncertain details unguessed. An offer depends on the specific equipment, condition, access and agreement between the parties.
What the 600 amperes marking describes
If 600 amperes appears in a nameplate or existing record, identify whether the marking describes the overall assembly, a main device or an individual breaker. For a mixed equipment list, record the equipment type, manufacturer, model and quantity as well as the specific location of the rating. The rating of a lineup is not automatically the rating of every device within it.
A 600 amperes marking alone does not establish voltage, physical dimensions, condition or value. Send the full available label or an existing document when it can be shared safely, and distinguish known facts from estimates. If a label is inaccessible or unreadable, leave it unknown; do not open equipment or conduct a test to obtain an offer.
Separate the mixed lot into lines
A mixed lot may include assemblies, loose devices and related components. Give each recognizable equipment type its own line with a quantity, location and any known manufacturer or ratings. Mark which pieces are sold together and which are merely nearby. This prevents a buyer from mistaking a spare part for an installed device or a different complete assembly.
If some pieces are uncertain, use a provisional description and link it to an existing photograph or document. Specify any excluded items and whether the lot has one owner or needs separate authorization. The buyer may assess different pieces differently; a combined submission does not guarantee an offer on every item.
Reconcile equipment from a finished job
A contractor closing a job may have stock at a jobsite and additional material in storage. Separate the items by actual owner and project allocation before proposing a sale. Existing purchase records or an asset list can help describe the equipment, but a job name alone does not prove the contractor owns every item.
Identify which assets are still installed and which are already stored, then share known pickup constraints at each property. Where a customer or another contractor must authorize release, note the dependency. The buyer can review the available information while the responsible parties clarify authority and timing.
If relevant: Build a useful warehouse inventory
A warehouse clearout can mix unused stock, previously installed gear, loose breakers and unidentified parts. Group items by equipment type and manufacturer where known, and list quantities and accessible exterior markings. Distinguish sealed or packaged stock from items whose contents or history are uncertain; a warehouse location alone does not establish whether an item is unused.
Record which racks or areas hold the proposed lot and identify any items the owner is keeping. Tell the buyer about relevant loading access or appointment constraints without trying to move heavy equipment yourself. Confirm who has authority to sell stock that may have come from different jobs or owners.
If relevant: Show what remains in the lineup
An incomplete lineup is not necessarily a single, uniform item. List the sections that are present, any known missing section, and which breakers or other components are loose, installed, retained or unknown. Give each section an identifier from existing records or a safely accessible exterior label; do not try to open compartments to fill gaps.
Explain whether the missing pieces were removed before the current owner acquired the gear or whether the history is unknown. If the seller wants to retain any sections, mark them as excluded. A buyer can review an incomplete lineup, but completeness, condition and the actual sale scope influence whether an offer is possible.
Link records to the actual equipment
An asset tag or existing inventory number can connect a description, photograph and location without turning every item into a separate narrative. Give quantities and identify what is included, excluded or missing. Manufacturer and model are helpful when known, while voltage and amperage should be associated with the particular label or device they describe.
Safe exterior photos and existing documents may provide a useful starting point. A drawing can be out of date and one breaker label does not necessarily describe a whole lineup, so identify the source of each claim. If the label cannot be reached safely or the history is uncertain, tell the buyer rather than guessing.
Confirm who can release the assets
A clear proposal identifies the authorized seller, the specific items offered and any parts that are not included. Different owners, tenants, contractors or lenders may have an interest in different assets, so disclose known restrictions and approval requirements. Use a separate entry for each site or equipment group when authority or availability differs.
State whether items are still installed, already removed or stored, and provide your best known release window as an estimate. Other project work can affect the handoff. Both sides should agree on the actual scope and schedule rather than assuming that a preliminary inventory or a hoped-for date is final.
From review to an agreed offer
This is a buying-only business; it does not sell electrical equipment. It considers used, surplus and decommissioned gear across all voltage classes, including switchgear from decommissioned data centers and shut-down power plants. A buyer reviews the actual equipment, condition, information and proposed scope before deciding whether to make an offer; no individual item is guaranteed acceptance.
If the parties agree on a deal, the buyer pays upfront before pickup. Confirm the agreed price, payment method, items included, any exclusions and timing with the authorized seller. A preliminary inquiry or estimate is not a completed transaction. Ask for clarification before accepting an offer if the proposed scope or payment terms are unclear.
Plan buyer-handled pickup
Once a deal is accepted, the buyer handles qualified disconnects, crane and rigging, loading, freight and hauling. Sellers do not need to test or disconnect the gear or do the physical lifting. Tell the buyer where the accepted items are located and who can coordinate access; disclose known gate, doorway, overhead or scheduling restrictions if relevant.
Provide existing measurements or weight records only when available and identify anything that is approximate. Different sites and equipment groups may need different arrangements. The parties coordinate a plan for the actual scope rather than assuming a standard truck, lifting method or guaranteed pickup date before the deal is reviewed.